PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Secure Vest 148 Facing South.jpg copper piping insulation at bathrooms 133-136 Facing West.jpg Finished closing up the block wall at corridor 149 next to sprinkler room Facing East.jpg Installing copper piping at the 1st floor Facing North.jpg Laying out block at 1st floor Intake Room Facing West.jpg Weather strips along the curtain wall South Elevation.jpg
Previous pageNext page copper piping insulation at bathrooms 133-136 Facing West
copper piping insulation at bathrooms 133-136 Facing West